|
GPS Survey
The stones that
mark the Mason and Dixon Line have remained stoically in their
position for over 230 years. Through the Revolutionary War,
Civil War, Industrial Revolution and 2Oth Century expansion and
growth, the stones set by Messrs's Mason and Dixon have acted as
sentinels, patiently marking the line which had for so long been
a matter of dispute. Time, however, is beginning to take its
toll.
In the 230 years
since the completion of the survey, there have been numerous
inventories conducted as well as surveys to re-monument sections
of the line. The most comprehensive "Re-survey" was conducted
from 1901 - 1903 on the Pennsylvania and Maryland section of the
line. During this re-survey, the stones were re-set in a base of
concrete. The stones which were missing were replaced with
replica stones as near as could be determined to the original
position based upon the information contained in the journal of
Mason and Dixon.
During the 1960's
and 1970's, NOAA using conventional geodetic surveying methods
surveyed the north-south line between Maryland and Delaware. The
position of the stones on the north-south line, therefore are
known and can be re-established in the event a stone is
destroyed or lost. This cannot be said of the stones along the
east-west line between Maryland, West Virginia and Pennsylvania.
If a stone is lost on this section of the line, it would require
locating several stones to the east and west and, using the
information contained in the original journal, the original
position of the stone could be approximated. By conducting a GPS
survey on the stones, we are determining the position of the
stones to sub-centimeter positional accuracy. This will allow
the position of the stone to be accurately re-established in the
event the stone is damaged or destroyed.
The GPS
survey of the Mason and Dixon line began in April 1995. Since
that time, we have conducted numerous GPS session with the
assistance of many volunteers. Some sessions involved 17
volunteers manning 15 dual-frequency receivers. To date, we have
established the position of 120 stones. The control networks for
the sessions have been tied to existing HARN and 1st order
geodetic control. |
|